Artículos técnicos

Making the Most of Mooring Integrity Management Improvements

Kent Longridge, InterMoor Inc., reviews the MIM improvements of the last few years and how they can save operators time and money.

Anchoring Solutions and Installation Methods for Offshore Wind

Overview of Anchoring Solutions and Smart Installation Methods for Offshore Floating Wind

Cutting the Cost of Decommissioning - Oilfield Technology April 2017

The operator of Tubarao Azul field contracted InterMoor do Brasil to plan and execute part of the field decommissioning work.

A Novel Installation Method for Deepwater Well Conductors - 2014 MCEDD

Our conductor installation method has been utilized in three major projects in South America, all of which were executed successfully according to client specifications. In this presentation, we described the most recent successful project which was a conductor installation for well first phase of the Tension Leg Well-head Platform (TLWP, P-61) in Brazil with stringent performance requirements by the clients.

 Una revisión histórica de la industria de amarre de plataformas

¿Cuál es la historia del mercado de amarre en alta mar? ¿Qué ha cambiado y qué ha permanecido igual en los últimos años? ¿Qué depara el futuro para este sector?

Integrity Index and Integrity-based Optimal Design of Structural Systems

InterMoor contributed to a paper published in Engineering Structures Vol 60 on "Integrity Index and Integrity-based Optimal Design of Structural Systems" Mousavi a,, Gardoni b. a Texas A&M University, b University of Illinois at Urbana-Champaign

Water Jet Cutting an Option throughout Structure's Life.

Abrasive water jet cutting technology cuts through steel without creating a heat affected zone.

Ponerse en contacto