Security and Peace of Mind on the Ocean Floor - Considerations for Pipeline Initiation Foundations

Successful subsea pipeline installation require precise control at the initiation point of the pipeline during the installation. Pipelines can cover anywhere from a few to a few hundred miles; being able to restrict the start location to a small area ensures that the finished pipeline will meet the specified performance criteria.Initiation anchors vary from suction piles to drag embedment styles.

InterMoor shares its experience in this September 2013 issue of World Pipelines. Download the full article by clicking on the link in the right hand column.

Ponerse en contacto